How a project runs

Four stages, in order. You will know which one you are in at any given time, and who is waiting on whom.

Stage 01

Site visit

We walk the property, look at the panel, the roof and twelve months of usage, and talk through what you are actually trying to solve.

Stage 02

Design & proposal

A system layout and a fixed written scope with real numbers — production estimate, equipment list, and what is and is not included.

Stage 03

Permits & approvals

We handle the building department, the HOA if there is one, and the utility interconnection application.

Stage 04

Build & commission

Installation, inspection, permission to operate, and a walkthrough of the monitoring app before we leave the site.

What to expect

The part nobody warns you about

The build itself is usually the fastest stage. Most of a solar project's calendar time is spent waiting on other people — the building department, the utility, and occasionally an HOA architectural committee.

We file all of it and chase all of it, and we will tell you honestly where a job is sitting rather than letting you wonder. If your jurisdiction is running slow that month, you will hear it from us before you have to ask.

Permission to operate — the utility's sign-off that lets you actually switch the system on — is the last gate, and it is the one entirely outside our control. Everything before it, we own.